Halaman ini berisi daftar dokumen yang dipersyaratkan untuk dimasukkan terkait dengan persyaratan TONNAGE
Ship Construction File / Review Report (Ship Construction File) |
Existing (VOLUME I), includes: |
- Particulars of the type and main dimensions of the ship, building year, building yard, freeboard, stability documentation and details of the anchor equipment |
- General Arrangement |
- Capacity Plan |
- Hydrostatic Curves |
- Midship Section |
- Scantling Plan |
- Decks |
- Transverse Bulkheads |
VOLUME II, includes: |
- Longitudinal Section |
- Ice Strengthening |
- Bulkheads |
- Bottom Structures |
- Engine and boiler seatings |
- Stem and stern post, and rudder |
- Hatchways (Hatchways Construction and hatch Covers) |
- Longitudinal Strength |
- Material |
- Weld Joints |
- Lashing and Stowage Devices |
- Substructures |
- Closing Conditions (ICLL possible) |
- Watertight integrity |
- Intact stability |
- Damage Stability |
- Structural Fire Protection |
- Special req |