terminal is to be carried out within five (5) years of the initial out in regular rotation to complete all of the requirements
Classification Survey, and at five-year intervals thereafter. The of the particular Special Periodical Survey within a fve-year
Special Periodical Survey may be commenced at the fourth period. The proposed arrangements are to provide for survey
Annual Survey and be continued with completion by the of approximately 20% of the total number of survey items
fifth anniversary date. Where the Special Periodical Survey during each year of the fve-year period. Reasonable alternate
is commenced prior to the fourth Annual Survey, the entire arrangements may be considered.
survey is to be completed within 15 months if such work is
to be credited to the Special Periodical Survey. Each part (item) surveyed becomes due again for survey
approximately five (5) years from the date of the survey
A Special Periodical Survey will be credited as of the completion and the due parts (items) are generally to be completed
date of the survey but not later than fve years from date each year. For Continuous Surveys, a suitable notation will
of build or from the date recorded for the previous Special be entered in the Register and the date of the completion
Periodical Survey. If the Special Periodical Survey is completed of the cycle published. BKI may withdraw its approval for
within three (3) months prior to the due date, the Special Continuous Survey if the Surveyor’s recommendations are
Periodical Survey will be credited to agree with the effective due not complied with. A properly conducted preventative-
date. Special consideration may be given to Special Periodical maintenance/condition-monitoring plan may be credited as
Survey requirements in unusual cases. Consideration may satisfying the requirements of Special Continuous Survey.
be given for extensions of Rule-required Special Periodical This plan must be in accordance with Guideline for Planned
Surveys under extreme circumstances. Maintenance Program.

At request of the Owner, and upon approval of the proposed
arrangements, a system of Continuous Surveys may be undertaken,
whereby the Special Periodical Survey requirements are carried



TABLE 2. Additional Class Notations

ITEM Characterization Notation

For floating Terminals that have self propultion system
and disassembly mooring and riser systems to allow the
Disc onnec table foating terminal to ride out severe weather or seek refuge (Disconnectable) 1
System
under its own power for a specifed design environmental
condition.

Floating Terminals that installed a dynamic positioning
Dynamic Positioning systems for station keeping purposes (BKI Part 1 Volume DP
System
I, 2012)

Floating terminals that designed and built for special (S years) followed by approved
On-site Operation
requirements on-site operation where approved by BKI. site of operation 2

Where requested, the dynamic load components
considered in the evaluation of the hull structure are
Dynamic Loading to include the external hydrodynamic pressure loads DYLA
Approach internal dynamic loads (fluids stored onboard, ballast,
major equipment items, etc.) and inertial loads of the hull
structure.

Notation for assigning fatigue life value for the FL (Years) 3
Fatigue Life hull, hull interface structure, position mooring system and
components. SFA (Years) 4